I will have time to begin this task from 14th March.
I've designed safety systems before, however this will be my first Fire Protection system for a commercial complex.
All designs and calculations will be submitted in a 'For Review' status, client side Senior Engineer should review, I can make changes, however he/she approves this design as 'For Construction'.
What kinds of drawings did you have in mind?
I envisage;
Electrical Equipment Layout Floor plan
Wiring diagrams
Termination diagrams (if required)
Probably one of each for each floor.