Flash - XML Calendar Daylight Savings Time Fix - repost
$30-120 USD
กำลังดำเนินการ
โพสต์ ประมาณ 11 ปีที่ผ่านมา
$30-120 USD
ชำระเงินเมื่อส่งงาน
We have a calander application developed using Flash and XML. The SWF app stopped working with the change in Daylight Savings Time. It is a known issue we encountered with the last DST time change. The developer temporarily fixed it by using the a Floor function although we need a permanent solution that will round the calculations and work in all scenarios. The developer did not have the time to fix it then and is unavailable now and I need this resolved as soon as possible (preferable this week). We also need a very simple spelling fix for the month of February. I have been told this should take an hour or so to correct. Would you be interested in reviewing the FLA?